{"id":48,"date":"2016-09-27T16:31:50","date_gmt":"2016-09-27T23:31:50","guid":{"rendered":"https:\/\/www.bellevuecollege.edu\/futurecampus\/?page_id=48"},"modified":"2025-05-08T15:42:27","modified_gmt":"2025-05-08T22:42:27","slug":"projects","status":"publish","type":"page","link":"https:\/\/www.bellevuecollege.edu\/futurecampus\/projects\/","title":{"rendered":"Project Spotlight"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><a href=\"https:\/\/www.bellevuecollege.edu\/futurecampus\/w-building\/\" data-type=\"page\" data-id=\"954\">W Building<\/a><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2025\/05\/W-Building-High-Def-Renders_NE-PROMENADE_Updated-300x169.jpg\" alt=\"Artist rendering of north east promenade view of W Building\" class=\"wp-image-979 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2025\/05\/W-Building-High-Def-Renders_NE-PROMENADE_Updated-300x169.jpg 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2025\/05\/W-Building-High-Def-Renders_NE-PROMENADE_Updated-1024x576.jpg 1024w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2025\/05\/W-Building-High-Def-Renders_NE-PROMENADE_Updated-768x432.jpg 768w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2025\/05\/W-Building-High-Def-Renders_NE-PROMENADE_Updated-1536x864.jpg 1536w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2025\/05\/W-Building-High-Def-Renders_NE-PROMENADE_Updated-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption class=\"wp-element-caption\">Architect rendering courtesy of Mithun<\/figcaption><\/figure><\/div>\n\n\n<p>Renovation and expansion of the new W Building begins spring 2025. The new facility will be located at the current site of the north wing of the C Building and greenhouse. Originally built in 1968, this space will be transformed into a modern hub for arts programs, including woodworking, printmaking, sculpture, ceramics, metalworking, digital media arts, and a makerspace. The building is also planned to meet LEED Silver (Leadership in Energy and Environmental Design) certification under the U.S. Green Building Council.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><a href=\"https:\/\/www.bellevuecollege.edu\/futurecampus\/projects\/studenthousing\/\">Student Housing<\/a><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"189\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2016\/09\/Housing-160920-BCSH-MainRendering-FINAL-300x189.jpg\" alt=\"Artist rendering of the h building\" class=\"wp-image-81 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2016\/09\/Housing-160920-BCSH-MainRendering-FINAL-300x189.jpg 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2016\/09\/Housing-160920-BCSH-MainRendering-FINAL-768x484.jpg 768w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2016\/09\/Housing-160920-BCSH-MainRendering-FINAL-1024x645.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n<p>H building is open and ready for occupancy as of Fall Quarter 2018. This project is approximately 132,725 SF building with 350+ beds in 137 units. The unit options are a mix of Studios, 2 Bedroom, 2 Bedroom\/4 bed (double occupancy) and 4 bedroom apartments. All units include in-unit kitchens and private bathrooms.<\/p>\n\n\n\n<p>A pizzeria is located on the main level of the HUB and a multi-purpose meeting room is located on the second level. The project features private study areas and lounges on each level.<\/p>\n\n\n\n<p>The building (construction began March 2017, and completed in Summer 2018)&nbsp;is designed to be highly sustainable with a potential for LEED Gold certification.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><a href=\"https:\/\/www.bellevuecollege.edu\/futurecampus\/projects\/student-success-center\/\">Student Success Center<\/a><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCSSC-View-1-Roundabout-at-Dusk-300x169.jpg\" alt=\"Artist's Rendering of the U building\" class=\"wp-image-451 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCSSC-View-1-Roundabout-at-Dusk-300x169.jpg 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCSSC-View-1-Roundabout-at-Dusk-768x432.jpg 768w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCSSC-View-1-Roundabout-at-Dusk-1024x576.jpg 1024w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCSSC-View-1-Roundabout-at-Dusk.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n<p>The New Student Success Center is all about breaking silos to put students on the path of success. The dynamic design enriches student experience and leverages staff collaboration and integration for student benefit and success.<\/p>\n\n\n\n<p>The project is currently under construction.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><a href=\"https:\/\/www.bellevuecollege.edu\/futurecampus\/projects\/masterplan\/\">Bellevue College Master Plan<\/a><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"300\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-300x300.jpg\" alt=\"Vector map of Bellevue College's master plan\" class=\"wp-image-511 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-300x300.jpg 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-150x150.jpg 150w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-768x768.jpg 768w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-1024x1024.jpg 1024w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-55x55.jpg 55w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-45x45.jpg 45w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan-100x100.jpg 100w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/224\/2018\/01\/BCMP-2017-Illustrative-Plan.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n<p>The Campus Master Plan was adopted by Bellevue College Board of Trustees in 2016. This master plan outlines the vision and path for the college&#8217;s future campus. The scope includes defining future&nbsp;building sites, open spaces, circulation patterns and campus physical capacity as well as planned and future projects.<\/p>\n\n\n\n<p>This document is structured to provide a comprehensive review of current assets and future changes to the physical campus and to assist with decision making within Capital Development.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>W Building Architect rendering courtesy of Mithun Renovation and expansion of the new W Building begins spring 2025. The new facility will be located at the current site of the north wing of the C Building and greenhouse. Originally built in 1968, this space will be transformed into a modern hub for arts programs, including <a class=\"read-more\" href=\"https:\/\/www.bellevuecollege.edu\/futurecampus\/projects\/\">...more about Project Spotlight<\/a><\/p>\n","protected":false},"author":310,"featured_media":0,"parent":0,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-48","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/pages\/48","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/users\/310"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/comments?post=48"}],"version-history":[{"count":7,"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/pages\/48\/revisions"}],"predecessor-version":[{"id":982,"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/pages\/48\/revisions\/982"}],"wp:attachment":[{"href":"https:\/\/www.bellevuecollege.edu\/futurecampus\/wp-json\/wp\/v2\/media?parent=48"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}