{"id":7520,"date":"2024-09-06T11:29:43","date_gmt":"2024-09-06T18:29:43","guid":{"rendered":"https:\/\/www.bellevuecollege.edu\/stupro\/?p=7520"},"modified":"2024-09-10T11:23:09","modified_gmt":"2024-09-10T18:23:09","slug":"renovations","status":"publish","type":"post","link":"https:\/\/www.bellevuecollege.edu\/stupro\/2024\/09\/06\/renovations\/","title":{"rendered":"Renovations &#8211; September"},"content":{"rendered":"\n<p><strong>C-Building Dining Area<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project currently underway<\/li>\n\n\n\n<li>Projected construction timeline 8\/1\/24- 9\/5\/24<\/li>\n\n\n\n<li>Improvements:\n<ul class=\"wp-block-list\">\n<li>Updated paint, ceiling, etc.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p><strong>C-Building Bathrooms (Interior bathrooms in Student Union)<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Planned start mid-September (Goal to have demolition completed before Fall quarter).<\/li>\n\n\n\n<li>Projected construction timeline 9\/3 &#8211; 11\/25\/24<\/li>\n\n\n\n<li>Improvements:\n<ul class=\"wp-block-list\">\n<li>Complete demolition of current bathrooms.<\/li>\n\n\n\n<li>All new floors, walls, paint, etc.<\/li>\n\n\n\n<li>Conversion of 1 area to be all-gender.<\/li>\n\n\n\n<li>New facilities &#8211; sinks, toilets, partition dividers<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p><strong>Larger Student Union Project&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Planned start late fall\/ early winter<\/li>\n\n\n\n<li>Projected construction timeline 1\/27\/25 &#8211; 5\/6\/25<\/li>\n\n\n\n<li>Improvements:\n<ul class=\"wp-block-list\">\n<li>Improved FFE throughout building (new flooring, new furniture, new paint, etc.)<\/li>\n\n\n\n<li>Updated space use<\/li>\n\n\n\n<li>Increase lounge space<\/li>\n\n\n\n<li>Separation of spaces in C212 to better utilize space when there are multiple uses.<\/li>\n\n\n\n<li>Integrate MCS space with U206 lounge<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p><strong>Serving Area and Kitchen Renovation<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction 12\/26\/24 &#8211; 5\/16\/25<\/li>\n<\/ul>\n\n\n\n<p>** All schedules may be subject&nbsp;to change.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"7532\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7338.jpg\" alt=\"Looking through the back windows of the Cafeteria.\" class=\"wp-image-7532 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7338.jpg 1024w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7338-300x225.jpg 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7338-768x576.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"7530\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7336-1024x768.jpg\" alt=\"An empty Cafeteria with tool and workers getting ready for demo work.\" class=\"wp-image-7530 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7336-1024x768.jpg 1024w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7336-300x225.jpg 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7336-768x576.jpg 768w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/IMG_7336.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"7531\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/thumbnail_IMG_7337.jpg\" alt=\"View of the Cafeteria towards the large back window, construction stuff on the floor and all furniture has been removed.\" class=\"wp-image-7531 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/thumbnail_IMG_7337.jpg 1024w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/thumbnail_IMG_7337-300x225.jpg 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/198\/2024\/09\/thumbnail_IMG_7337-768x576.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>C-Building Dining Area Project currently underway Projected construction timeline 8\/1\/24- 9\/5\/24 Improvements: Updated paint, ceiling, etc. C-Building Bathrooms (Interior bathrooms in Student Union) Planned start mid-September (Goal to have demolition completed before Fall quarter). Projected construction timeline 9\/3 - 11\/25\/24 Improvements: Complete demolition of current bathrooms. All new floors, walls, paint, etc. Conversion of 1 <a class=\"read-more\" href=\"https:\/\/www.bellevuecollege.edu\/stupro\/2024\/09\/06\/renovations\/\">...more about Renovations &#8211; September<\/a><\/p>\n","protected":false},"author":76,"featured_media":7532,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[27],"tags":[],"class_list":["post-7520","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renovations"],"_links":{"self":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts\/7520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/users\/76"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/comments?post=7520"}],"version-history":[{"count":4,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts\/7520\/revisions"}],"predecessor-version":[{"id":7534,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts\/7520\/revisions\/7534"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/media\/7532"}],"wp:attachment":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/media?parent=7520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/categories?post=7520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/tags?post=7520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}