{"id":7883,"date":"2025-04-08T15:14:35","date_gmt":"2025-04-08T22:14:35","guid":{"rendered":"https:\/\/www.bellevuecollege.edu\/stupro\/?p=7883"},"modified":"2025-04-18T11:11:25","modified_gmt":"2025-04-18T18:11:25","slug":"w-c-building-projects","status":"publish","type":"post","link":"https:\/\/www.bellevuecollege.edu\/stupro\/2025\/04\/08\/w-c-building-projects\/","title":{"rendered":"W &amp; C Building Projects"},"content":{"rendered":"\n<p><strong>W Building Project<\/strong><\/p>\n\n\n\n<p>Starting 5 PM Friday, April 11, parking lots D1, C7, C8, C10, and C12 will be closed to make way for the new W Building. This building will be located in the current footprint of the north part of the C Building and the Greenhouse. Construction will begin at the end of April.<\/p>\n\n\n\n<p><strong>Student Union<\/strong> <strong>Building Project<\/strong><\/p>\n\n\n\n<p>The Student Union project includes renovating MCS and Student Engagement spaces, public areas, and the dining area&#8217;s kitchen. Work is planned for May with a goal of reopening in early September. During the project, the building and the dining facilities in the Student Union Building will be closed.<\/p>\n\n\n\n<p><strong>On May 9, Student Engagement, MCS, ASG and the LGBTQ+ Resource Center will be moving out of the C building to a temporary location.<\/strong> MCS and Student Engagement will temporarily reside on the first\u00a0floor of the L building. ASG and the LGBTQ+ Resource Center will be housed in the S building. (Exact locations will be announced soon.)<\/p>\n\n\n\n<p>Questions? <a href=\"mailto:michael.kaptik@bellevuecollege.edu\">Please contact Mike Kaptik,<\/a> Dean of Student Life and Leadership<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>W Building Project Starting 5 PM Friday, April 11, parking lots D1, C7, C8, C10, and C12 will be closed to make way for the new W Building. This building will be located in the current footprint of the north part of the C Building and the Greenhouse. Construction will begin at the end of <a class=\"read-more\" href=\"https:\/\/www.bellevuecollege.edu\/stupro\/2025\/04\/08\/w-c-building-projects\/\">...more about W &amp; C Building Projects<\/a><\/p>\n","protected":false},"author":76,"featured_media":7884,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[27],"tags":[],"class_list":["post-7883","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renovations"],"_links":{"self":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts\/7883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/users\/76"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/comments?post=7883"}],"version-history":[{"count":6,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts\/7883\/revisions"}],"predecessor-version":[{"id":7909,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/posts\/7883\/revisions\/7909"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/media\/7884"}],"wp:attachment":[{"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/media?parent=7883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/categories?post=7883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/stupro\/wp-json\/wp\/v2\/tags?post=7883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}