{"id":24552,"date":"2026-08-04T10:38:39","date_gmt":"2026-08-04T17:38:39","guid":{"rendered":"https:\/\/www.bellevuecollege.edu\/sustainability\/?p=24552"},"modified":"2026-08-04T10:38:40","modified_gmt":"2026-08-04T17:38:40","slug":"bellevue-transit-center-reroutes-until-feb-2027","status":"publish","type":"post","link":"https:\/\/www.bellevuecollege.edu\/sustainability\/2026\/08\/04\/bellevue-transit-center-reroutes-until-feb-2027\/","title":{"rendered":"Bellevue Transit Center Reroutes until Feb. 2027"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Head\u2019s up that a number of local\/downtown bus routes will be impacted by construction reroutes. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Below is a map detailing the Bellevue Transit Center reroutes during construction. These reroutes will be in place until October. \u00a0Construction will run until February 2027 as the Transit Center is renovated to prepare for the new Stride Rapid Transit lines.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"723\" src=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/16\/2026\/08\/Image-5-1024x723.png\" alt=\"Map detailing bellevue transit center reroutes\" class=\"wp-image-24553 img-fluid \" srcset=\"https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/16\/2026\/08\/Image-5-1024x723.png 1024w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/16\/2026\/08\/Image-5-300x212.png 300w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/16\/2026\/08\/Image-5-768x542.png 768w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/16\/2026\/08\/Image-5-1536x1085.png 1536w, https:\/\/www.bellevuecollege.edu\/wp-content\/uploads\/sites\/16\/2026\/08\/Image-5.png 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Head\u2019s up that a number of local\/downtown bus routes will be impacted by construction reroutes. Below is a map detailing the Bellevue Transit Center reroutes during construction. These reroutes will be in place until October. \u00a0Construction will run until February 2027 as the Transit Center is renovated to prepare for the new Stride Rapid Transit <a class=\"read-more\" href=\"https:\/\/www.bellevuecollege.edu\/sustainability\/2026\/08\/04\/bellevue-transit-center-reroutes-until-feb-2027\/\">...more about Bellevue Transit Center Reroutes until Feb. 2027<\/a><\/p>\n","protected":false},"author":2101,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1],"tags":[],"class_list":["post-24552","post","type-post","status-publish","format-standard","hentry","category-archive"],"_links":{"self":[{"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/posts\/24552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/users\/2101"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/comments?post=24552"}],"version-history":[{"count":1,"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/posts\/24552\/revisions"}],"predecessor-version":[{"id":24554,"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/posts\/24552\/revisions\/24554"}],"wp:attachment":[{"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/media?parent=24552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/categories?post=24552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bellevuecollege.edu\/sustainability\/wp-json\/wp\/v2\/tags?post=24552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}